Search Results for: Textile floor covering
the technical services department to conduct a review of the plan for compliance to all applicable codes before a permit is issued and the work can be started. these construction drawings must be consistent, to scale, dimensioned, specific, and legible, including but not limited to the following: floor
recent past use of the intended space. door location, sizes, and direction of door swing. exit and emergency lighting locations and type. utility location (electric panels, water meter, gas meter, etc.) existing or new installation of plumbing fixture location and types. type of finish material such as floor...
https://greeceny.gov/departments/building-department/commercial-guidelines-permits